Active

BRONTE PLANT

From the intersection of Hwy 277 and State Highway 158 in Bronte, go west on State Highway 158 towards Robert Lee for 1.7 miles to Humble Road. Turn left onto Humble Road and travel 1 mile to Double Barrel Rd. Turn right on Double Barrel Rd. and travel .5 miles to the plant entrance on the left. Turn left and follow the road .8 miles to the main office., Coke County, TX
MSHA ID4104210
TYPESurface
MATERIALConstruction Sand and Gravel
EMPLOYEES6

MATERIALS PRODUCED

Construction Sand and Gravel

COMPANY INFORMATION

Operator

Ingram Readymix No. 87, L.L.C.

Parent Company

Ingram Readymix

Company Type

Other

DIRECTIONS

170

CONTACT

Contact information not available for unclaimed listings.

Are you the owner? Claim this listing

31.876944, -100.365278

Data Source

Mine Safety and Health Administration (MSHA)

Last updated: 1/30/2026